Show mechanical equipment location, weight and screening. This insures a quality, custom and cost effective landscape design. Plans and Standards; Utilities Codes and Standards; Water Engineering Standards; City of Bellevue, WA. WebSewer, surface water, and water codes, engineering standards, maps and comprehensive plans. Phone: 360-487-7130 Show a layout and detailing of the anchoring or bracing system, showing cables, rods, tie- downs, or dead men. -
Utilities Codes and Standards | City of Bellevue Preliminary Civil Plans Requirements - bellevuewa.gov 4500 SE Columbia Way endobj on Specify foundation wall thickness, reinforcing bar size and spacing, reinforcing bar clearance, footing depth below grade, clearance between grade and sill plate, maximum wall height, connections, anchor bolt size and spacing, and drainage for foundation retaining wall. Show the.
Transportation Development Review and Capital WebAll civil plans shall be prepared by a professional engineer, licensed in Washington State, with relevant roadway, street lighting and traffic signals design experience. Web1.3K views, 46 likes, 26 loves, 56 comments, 9 shares, Facebook Watch Videos from Asbury Seminary Chapel: Asbury Seminary Chapel was live. WebThe 2023 Construction Standard Specifications and Standard Plans apply whenever any public or private construction is performed in the City of Seattles Right of Way. Specify structural observation if required for the project. Also refer to Sign Requirements for Building Review. WebVoltage drop calculations should include all lights on affected circuits. As affected government agencies and courts begin to re-open, we will resume our program in those jurisdictions. Shepherds Hood Detail for Type O and Type P Street Lighting Standards, Vandal Resistant Bollard (Lighted and Non-Lighted), Typical Connecting Public Street with Pathways and Lighting, Street Light Contactor Service Wiring Diagram, Typical Interconnect Conduit and Cable Installation, DISCONTINUED: Fiber Optic Terminal Cabinet Detail, Interconnect Junction Box to Splice Box Detail, DISCONTINUED: Fiber Optic Splice Enclosure and Cable Management, DISCONTINUED: Communication Cabinet Detail, Lighted Crosswalk Enclosure Electrical Cabinet Detail, Lighted Crosswalk Enclosure Wiring Diagram, Rapid Rectangular Flashing Beacon Assembly Detail, Rapid Rectangular Flashing Beacon Foundation Detail, Rapid Rectangular Flashing Beacon Service Cabinet Detail, Rectangular Rapid Flashing Beacon Assembly With Solar Mounted Power Source, School Flasher Standard Detail Construction Notes and Indicator Light Detail, School Flasher Standard Details Control Cabinet Detail, School Flasher Standard Detail Wiring Diagram, School Flasher Standard Detail Optional Installation on Existing Light Pole and Service Connections, Street Name Sign Placement at "T" Intersections, Street Name Sign Placement at 4-way Intersections, Street Name Sign Placement at Angled and Curved Intersections, Street Name Sign Placement at "Special Condition" Intersections, Pavement With Transition Signs and Markings, Typical Signing for School Area Traffic Control with Raised Crosswalk, Typical Signing for School Area Traffic Control, Stop Sign, Stop Bar and Crosswalk Locations Details, Triangle Speed Bump Legend and Bump Legend at Raised Crosswalk, On-Street Parallel Parking Stall Markings, On-Street and Parking Facility Angle Parking Stall Marking, Thru-Right and Thru-Left Turn Arrow Markings. However, we have no obligation with any contractors and client-recommended contractors are welcome to provide proposals for the work. Show the faade of the entire building with all other existing and proposed signs included. WebAcross thousands of properties and over 30 hotel brands, well help you seamlessly plan your next event and take it a step beyond. WebUtilities Projects, Plans and Standards; Utilities Codes and Standards; Surface Water Engineering Standards; 2022 Details; 2022 Details. WebSurface Water Engineering Standards The city provides current and previous surface water engineering standards, including detail drawings and a summary of the updates to the Show an elevation of all existing and proposed signs; note materials, color and finishes. WebThe city provides current and previous water engineering standards, including detail drawings and a summary of the updates to the standards. Please try again shortly. Engineering plans for private development projects that affect streets shall include all applicable Transportation Standard Details. Utilities' engineering standards are updated annually. WebAll plans and drawings submitted for a Small Wireless Facilities (SWF) permit must comply with the terms and requirements contained in this document. WebStructural Plans Requirements A Structural drawings set includes the following components as they apply to your project. Consent is not a condition of purchase.
Bellevue WebThe Periscope Art & Architecture Educational Institute existed as a 501(c)(3) project platform activating a nexus of art, architecture, and urbanism for higher learning. Retaining structures higher thanfour feet require an engineered design with calculations. Provide shear wall schedule and hold-down schedule specifying required framing, fasteners and connectors. Utilities plans and reports Located at the south shore of Lake Washington, the Airport has a land-based and sea-based airstrip. WebThe City may require additional information as needed. Your rating will help other customers make the smart choice when hiring. {{}~v]/8gJ2*fwT_TLO`*'y0't9I( Provide a structural design to accommodate the equipment and show visual screening. The Water Utility Code, part of Chapter 24.02 of the SOLD MAR 17, 2023. Each development within a BelRed land use district must comply with the provisions of the BelRed Subarea Design Guidelines contained in this section.
Utilities Projects, Plans and Standards | City of Bellevue Specify maximum design concrete strength, concrete sack mix and reinforcing bar grade. 450 110th Avenue NE; Bellevue, WA We verify any applicable state-level licenses, and we require every business to attest that they carry the appropriate local licensing to practice their trade. themselves and their business on their profile. Remodel? WebThese Engineering Standards set forth minimum standards for the planning, design, and construction of water facilities. City of Bellevue, WA. Sun. All structural components of the sign itself (size included). Voltage drop calculations should include all lights on affected circuits. WebPervious pavement codes, engineering standards, maps, and comprehensive plans related to utilities are presented here. Public Works Development Guidelines and Improvement Standards. Provide AGi32 digital file with CAD base as background. 2 0 obj<>
Standards Show typical foundation sections. Provide seismic bracing details for suspended ceilings, lighting fixtures, and mechanical equipment per ASTM 635 and 636. Specify grading and species of all framing lumber, including sheathing. Locate and note the size, height and type of all existing signs for the business. Our third-party vendor uses a national criminal database ("NCD") to screen service professionals.
Standards Water Engineering Standards | City of Bellevue $1,630,000 Last Sold Price. WebWhen structural changes are made, plans must be stamped by a licensed Washington State architect or engineer. Businesses will not be admitted to the network if their owners or principals have the following felonies in their available criminal records*: Our background check does not exclude service professionals unless the crime at issue is a felony. Specify connections. Specify all structural materials and connections. If you have any questions, please visit or call Specify all design loads. A preliminary street lighting plan may be required at the discretion of the Transportation Department for any project with public street frontage. Show a section of the stairs. All Utilities capital projects valued at $100,000 or more can be found on the city's capital projects map. The Bellevue standards Repair? The best date ideas in Boston with free events, outdoor events, restaurant, concerts, museums, and sports. The first step in most landscape design projects is to collaborate with the individual homeowner/property owner to come up with an overall conceptual plan (or "master plan") of the property. Where Puget Sound Energy (PSE) owns or will own the street lighting system (generally on local streets), a PSE construction drawing (for their own crews installation) must be submitted to the city by PSE at the developers request and expense. Fax: 360-487-7139. Provide a typical foundation section. WABO-certified fabrication shops are deemed as Approved Fabricators and are exempt from special inspections during fabrication. Confirm your appointment with We require all users - pros and homeowners - to uphold our core values as outlined in our. Take steps to avoid asbestos danger, Reducing, Reusing and Recycling Plastic Bags and Wrap, Garbage & Recycling Services for Your Business, Archives, Resources & Historical References, What Will Winter Bring? | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map. State Construction Stormwater General Permit. Suggestions and comments are welcomed. All work must conform to the City of Bellevues standard plans and specifications. Show the planting area around the base of the sign (a minimum of one square foot of landscaping for each square foot of the sign surface area). Please be advised that, during this period, if we could not perform a background check, HomeAdvisor will allow the business into the network and match the business to consumers. Show the location of footings, foundation mats, piles and grade beams, including all dimensions and top of footing elevations. Refer to the Transportation Design Manual and Street Lighting Design Guide (Appendix A). WebStandard, Allianz Global, Axiom Alternative Investments, Baillie Gifford, Bellevue Asset Management, Fidelity International, JP Morgan and Polar Capital. If you have concerns that a pro in our network doesn't meet these standards, please. Vancouver Public Works Encourages Public to Be Prepared, Winter is here!
STANDARDS FOR PLANS AND DRAWINGS b$?? Identity Verification (Reverse Phone Lookup) We conduct a reverse business phone lookup to identify records matching the phone number information provided by the business.
City of Renton Please note that as of September 1, 2021, multiple details have been updated. Specify reinforcement footing size, minimum embedment and reinforcement. Pavement specifications shall be as Specify GLU-LAM beam stress grade and combination symbols. We are licensed and professional landscape architects. Hard copies of the current details are available upon request as noted above from the Public Works Construction and Engineering Office, 520 SE 155th Ave., and at the city's Community Economic Development department, 415 W. Sixth Street. Learn more Provide approval/testing information per industry standards.
The Transportation Standard Details have been grouped into sections of similar street features. Show all property lines and note the dimensions. Specify the special inspections required for the type of construction, as outlined in Chapter 17 of the International Building Code.
Inviting Environments, Inc. | Greenwich, CT 06830 Destination. Change. W-2: Vertical Blocking with Restrained Joints for New Lines, W-3: Vertical Blocking for Connecting to Existing Main, W-5: Pipe Clamp and Anchor Rods for Concrete Blocking, W-8: Typical A.C. Water Main Crossing Replacement Detail, W-14: Fire Hydrant Guard Post & Valve Marker Post, W-19: Pressure Reducing Station Access Ladder and Pressure Relief Drain, W-20: Individual Pressure Reducing Valve Assembly (Residential), W-21: Individual Pressure Reducing Valve Assembly (Multi-Family or Commercial), W-22: Individual Pressure Reducing Valve Assembly with Pressure Relief (Multi-Family or Commercial), W-23: 1" X 1" Water Service (Horizontal Meter Setter), W-24: 1" X 1" Water Service (Vertical Mater Setter), W-25: 1 Domestic Water and/or Fire Service, W-26: 1 Domestic Water Service (Commercial and Multi-Family), W-28: 1 Irrigation Water Service (Commercial and Multi-Family), W-29: 2" Domestic Water and/or Fire Service, W-30: 2" Domestic Water Service (Commercial and Multi-Family), W-32: 2" Irrigation or Fire Sprinkler Water Service (Commercial and Multi-Family), W-33b: 3" Domestic Meter Materials List and Vault Requirements, W-33c: 4 Domestic Water Meter Installation, W-33d: 4 Domestic Meter Materials List and Vault Requirements, W-33f: 6 Domestic Meter Materials List and Vault Requirements, W-34b: 8 Domestic Meter Materials List and Vault Requirements, W-35: 3" to 6" Irrigation Meter Installation, W-36:1" to 2" Double Check Valve Assembly for Irrigation System (Outside Installation), W-38:Double Check Valve Assembly (Inside Installation), W-39:Outside DCVA Installation for 1 to 2" Commercial Fire Sprinkler Systems, W-40:Outside DCVA Installation for 3" or Larger Commercial Fire Sprinkler Systems, W-41:1 TO 2 Domestic Double Check Valve Assembly For Continuous Supply (Outside Installation), W-42:3 TO 6 Domestic Double Check Valve Assembly For Continuous Supply (Outside Installation), W-43:8" and 10" Domestic Double Check Valve Assembly for Continuous Supply (Outside Installation), W-44:3" to 10" Double Check Valve Assembly for Domestic and Irrigation Services (Outside Installation), W-45:3" to 10" Double Check Detector Assembly for Fire Sprinkler Systems (Outside Installation), W-46a:Reduced Pressure Backflow Assembly for Domestic and Irrigation Service (Outside Installation), W-46b:3" to 10" Reduced Pressure Backflow Assembly for Domestic and Irrigation Service (Buried Vault Installation), W-47:3" to 10" Reduced Pressure Detector Assembly for Fire Sprinkler Systems (Outside Installation), W-48:Reduced Pressure Backflow Assembly (Inside Installation), W-50:Requirements for FDC and Check Valve Routed Through Backflow Assembly Vault - 2, W-54:Roadway Clearances for Above Ground Appurtenances, 2019City of Bellevue | All Rights Reserved. All other standard details may be included in the civil plans as an option. If a business states that it's registered as a corporation or limited liability company, we confirm that the company is in good standing in the state in which they operate. Provide typical foundation sections. PSE must apply for all required permits prior to beginning work and will install the equipment. Capital Improvement projects require the details to be part of the plans. ;7gH;[FV#4.AqL~ Ex@a|4`l5uJ"a`BM9. about HomeAdvisors screening and approval process. Street Lighting Grounding Details and "V" Disconnect-Fused for A.W.G.
This plan must clearly state pole locations, pole type and height, luminaire arm type and length, luminaire type, and wattage. If required, the plan is typically done early in the design review or preliminary plat/short plat process. Shoreline Master Program. A Highly motivated Rigging/Lifting Engineer,(LOLER Appointed Person, ECITB,OPITO and LEEA certified) Technical Professional with a Graduated Construction Engineering University background, with distinguished experience planning Rigging and Lifting, onstruction projects from inception to completion on time and budget. Electronic copies of the details are available in Adobe Acrobat (PDF format). This is a team effort between the homeowner and Inviting Environments and is fun!
Surface Water Engineering Standards | City of Bellevue We are unable to process your request. Web2022 Water Engineering Standards Individual Details. By clicking Get a Quote, you affirm you have read and agree to the HomeAdvisor Terms & Conditions, and you agree and authorize HomeAdvisor and its affiliates, and their networks of Service Professionals, to deliver marketing calls or texts using automated technology to the number you provided above regarding your project and other home services offers. Is this your business? We perform this screening when a business applies to join our network and, if the business is accepted, Include detailed voltage drop calculations along with illumination calculations and luminary photometrics. Find hiring guides, material costs, expert advice, how-to's and more.
Thrillist WebCity of Bellevue Submittal Requirements 1 STANDARDS FOR PLANS AND DRAWINGS 8/9/2016 The Bellevue standards for plans and drawings are necessary for clarity, for %PDF-1.7 3 Baths. 4 0 obj<> Specify all welding to be done by WABO-certified welders. Your plan reviewer will provide information on more specific requirements.
1417 NW Winters Creek Rd What is the screening process that Service Professionals go through in order to become members of the HomeAdvisor network? Provide details for all unusual, project specific conditions. The purpose of this preliminary plan is to determine if modifications to the street lighting system are required in order to meet the citys design standards. 450 110th Avenue NE; Bellevue, WA 98004; Directions to City Hall; Monday-Friday 8 a.m.-4 p.m. Footer Menu Contacts. location and signage for disabled parking stalls. Wed. Thu. Show typical construction of walls, wall bracing, ceiling assemblies and connections. ), wind, seismic, snow, equivalent fluid pressure, soil bearing values and geotechnical engineering parameters. review or verify the information representations set forth in those Draw all proposed signs (to scale); note the size and type. Include the height of any unbalanced retained soil. 2019City of Bellevue | All Rights Reserved. A.
Structural Plans Requirements | City of Bellevue Transportation Standard Details are provided for the purpose of construction standards and requirements for City of Vancouver projects. 20.25D.150 Design Guidelines. Do your own research using online ratings, reviews and through phone interviews before hiring a company.
Plans and Drawings for Sign Permits | City of Bellevue Standard Drawings Due to the coronavirus pandemic, several government agencies and courts across the country have temporarily closed their offices. Floor WebUtilities Projects, Plans and Standards; Utilities Codes and Standards; Surface Water Engineering Standards; 2019 Surface Water Engineering Standard Details; City of Services Offered by Inviting Environments, Inc. A complete street lighting plan may be required for all projects with public street frontage requiring new street lights or at the discretion of the Transportation Department. whenever concerns are brought to our attention. Lets find you the best HomeAdvisor screened and approved professionals. Introduction. The Utilities Department maintains pipes and pump stations with dozens of capital projects each year, including the following major ones. WebAn architectural set of drawings consists of the following elements as they apply to your project. Inviting Environments, Inc. has ongoing working relationships with the highest quality contractors and professionals including pool construction companies, landscape and masonry contractors, irrigation and lighting contractors, surveyors, wetlands and environmental specialists, architects, engineers and others. A geotechnical report may be required for single family residential structures and townhomes if unstable soils conditions exist.
Requirements for Recorded Documents | City of Bellevue endobj Where the city owns or will own the street lighting system (generally on arterial streets or downtown), the Preliminary Street Lighting Plan must be submitted by a Washington State-registered civil or electrical engineer experienced in street lighting design, at the developers request and expense. Dates. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map, State Construction Stormwater General Permit. The above screening process does not apply to Corporate Accounts, as HomeAdvisor does not screen Corporate Accounts or Corporate businesses. Include live (including floor, stair, etc. The street lighting plan will provide required details for construction of the street lighting system and be part of the approved engineering plan. Specify structural framing members, including size, spacing, layout, supports, connections, blocking, etc. 2023 Sewer Engineering A Structural drawings set includes the following components as they apply to your project. 1 0 obj<>/Metadata 375 0 R/ViewerPreferences 376 0 R/AcroForm 379 0 R>> | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map, Education Resources for Students and Teachers, Emergency Water Supply Distribution Master Plan, Factoria Boulevard Stormwater Conveyance Improvements Project, Kelsey Creek Culvert at Lake Hill Project, Lake Washington Lake Line Management Plan Project, Newport Sewer Basin Improvements Projects, Somerset Reservoir Decommissioning Project. Applicable T10 series details must be part of the civil plans.
P A R T 1 Design Standards - bellevuewa.gov *The comprehensiveness of the NCD varies by state.
Please note that HomeAdvisor does not confirm local licensing. Public Works Administration Ft. 1556 SE Ballantrae Ct, Port Saint Lucie, FL 34952. Provide a street light level analysis using AGi32 software to determine optimal street light locations that meet the citys standards. DIY Project? Vancouver, Washington Identify all deferred submittals for the project.
Eduard Yefimenko All Indicate size, spacing, and structural grading of all members, sheathing and connections. Show in half tone all relevant proposed and existing features, including but not limited to above and below ground utilities, building awnings/overhangs, street trees, crosswalksand driveways. Vancouver Public Works crew and equipment are ready, Severe Weather Response - Deicing Streets, Preventing and Handling Frozen Water Pipe, Improving our Street System - Needs and Strategies, Traveling Vancouver Streets - Self-guided Streets Trip, Broadway Corridor Utility and Paving Project to start mid-February 2022, Vancouver prepares for busy 2021 season of paving and preserving streets, NE 18th Street West - Public Outreach and Information, SE Mill Plain Boulevard Improvement Project, Public invited to NE 137th Avenue Open House on Wednesday, Dec.3, Lane Closures Planned for SE 1st Street Project Starting January 2022, NE 137th/138th Avenue Improvement Project, Fourth Plain Area - Sidewalk Project along Rossiter and Neals Lanes, Q&A - Vancouver LED Street Light Conversion, Street Funding Strategies Input & Outreach, City of Vancouver Construction Projects - Weekly Update, Vancouver recognizes Mac Award Winner Urban Youth Program during monthlong tree celebration, International Day of Forests Trivia Night, VOLUNTEER Friends of Trees Northeast Vancouver Planting, Caring for trees now protects against future damage, Tree Canopy Achievement Program - TreeCAP, Tree Care Companies with Street Tree Worker License, Guide to Invasive Trees in the City of Vancouver, Urban Forestry Seeks to Make a Difference With Annual Yard Tree Giveaway, Silva Bolds-Whitfield Award Monument Plaza, Silva Bolds-Whitfield Urban Forestry Award, Stormwater, Surface Water & Groundwater Utility, Controlling Development and Construction Runoff, Surface Water/Stormwater Design & Construction Requirements, Reading in the Wild Story Time with Nature, Fantastic Facility - About the Water Center, Sewer System & Wastewater Treatment Facilities, Sewer Connection Incentive Program (SCIP), Sewer Connection Incentive Program Projects, Partnering with Clark Regional Wastewater District, Trenchless Service Lateral Repair Information, Water, Sewer and Surface Water Capital Improvement Program, General Requirement Standards & Details for Water, Sanitary Sewer & Stormwater, Transportation Improvement Program Comments & Suggestions, Transportation Development Review Information, Tree Requirements for Development Projects, Sewer improvement project to impact East 6th Street downtown, Spring coupons offer free disposal of yard debris, tires, Vancouver prepares for busy season of paving and preserving streets, Single Family Residence Driveway With Wings and No Curb, Sidewalk Replacement Minimum Criteria to Ensure ADA Compliance, Single Directional Curb Ramp Attached Sidewalk, Single Directional Curb Ramp Detached Sidewalk, Standard Landing Cross Sections A-A and B-B, DISCONTINUED: Paver Landing Cross Sections A-A and B-B, Standard Landing Cross Sections C-C and D-D, DISCONTINUED: Paver Landing Cross Sections C-C and D-D, Ramp Lip Detail and Detectable Warning Pattern, Pedestrian Refuge Island Intersection with Nose, Typical Pedestrian Refuge Island Sections, Construction Notes for Irrigation within Right of Way ONLY, Automatic Control Valve with UNIK Control Module, DISCONTINUED: Double Check Valve Assembly (DCVA), DISCONTINUED: Tree Planting Perforated Pipe Installation, DISCONTINUED: Deciduous Balled/Burlap Tree Planting, Shrub Container Planting, Perennial and Ground Cover Details, 4' x 8' Tree Grate Frame Preferred Option, Tree Grate Frame for Paver Sidewalk Areas, Intersection Cross Slopes and Crown Run-Off, Arterial Streets Residential/Commercial Driveway Widths, Standard Trench Restoration Notes (Sheet 1 of 2), Standard Trench Restoration Notes (Sheet 2 of 2), Standard Trench Restoration - HMA Granular Backfill, Standard Trench Restoration - HMA Control Density Fill, Standard Trench Restoration - HMA - Transverse Cuts, Standard Trench Restoration Portland Cement Concrete Pavement, Steel Layout for Concrete Patch - Interior, Steel Layout for Concrete Patch - Exterior, Curb and Gutter Restoration at Driveways with Detached Sidewalk, Optional E-1 Curb Replacement with A-1 Curb and Gutter, Test Hole (Pothole/Test Hole/Monitoring Well) Section and Plan View, Fourth Plain Boulevard "Village" Sidewalk, Fourth Plain Boulevard "Village" Corner Without Bus Stop, Fourth Plain Boulevard "Village" Corner With Bus Stop, Fourth Plain Boulevard "Green Necklace" Sidewalk North Side, Fourth Plain Boulevard "Green Necklace" Sidewalk South Side, Fourth Plain Boulevard "Commercial" Street Sidewalk, Fourth Plain Boulevard Paver at Tree Well and Planter Strip, Fourth Plain Boulevard Pedestrian Access at Unsignalized Locations, Vandal Resistant Bollard (lighted and non-lighted), Typical Connecting Public Street with Pathway and Lighting, Chain Link Fence Blow-up Details Types 3 and 4, Chain Link Gate Blow-up Details Types 3 and 4, Street Termination for Personal Vehicles (not Emergency Vehicles), Local Access and Loop Road Half Street Construction, 6-Lane Principal Arterial with Center Left-Turn and Bike Lanes, 6-Lane Principal Arterial with Center Left-Turn Lane, 4-Lane Principal Arterial with Center Left-Turn Lane and Bike Lanes, 4-Lane Principal Arterial with Center Left-Turn Lane, 4-Lane Minor Arterial with Center Left-Turn and Bike Lane, Fort Vancouver Way - Campus Street Standard (McLoughlin to Fourth Plain), 4-Lane Minor Arterial with Center Left-Turn Lane, 3-Lane Collector/Minor Arterial with Bike Lanes, Neighborhood Circulator Non Residential Local Access, Local Access Option A (32' Roadway Width), Local Access Option B (28' Roadway Width), Traffic Control Detail - One-Lane, Two-Way Traffic Control with Flaggers, Traffic Control Detail - Pilot Car Operation, Traffic Control Detail - Single-Lane Closure for Multi-Lane Roadways, Traffic Control Detail - Double- Lane Closure for Multi-Lane Roadways, Traffic Control Detail - Shoulder Closure - Low Speed (40 MPH OR Less), Traffic Control Detail - Shoulder Closure High Speed, Traffic Control Detail - Temporary Off-Ramp for Multi-Lane Roadways, Traffic Control Detail - Temporary On-Ramp for Multi-Lane Roadways, Traffic Control Detail - Right Lane Closure with Shift - 5 Lane Roadways, Traffic Control Detail - Left Lane and Center Turn Lane - 5 Lane Roadways, Traffic Control Detail - Lane Shift - 3 Lane Roadways, Traffic Control Detail - Short Term Ramp Closures, Traffic Control Detail - Intersection Lane Closure - 3 Lane Roadways, Traffic Control Detail - Intersection Lane Closure - 5 Lane Roadways, Traffic Control Detail - Intersection Pedestrian Traffic Control, Traffic Control Detail - Mid-Block Pedestrian Traffic Control, Traffic Control Detail - Single Lane Closure with Shift, Traffic Control Detail - Typical Roundabout Flagging Operation, Traffic Control Detail - Intersection Lane Closure - 2 Lane Roadways, Traffic Control Detail - Temporary Pedestrian Ramp with Edge Board, Traffic Control Detail - Temporary Pedestrian Platform with Edge Board, Mast Arm Configurations for Type II and Type III Traffic Signal Standards, Pole Configurations for Type II, Type III, Type B and Type S Traffic Signal Standards, Recessed Terminal Compartment Detail for Type II, Type III, Type B and Type S Traffic Signal Standards, Type I, Type I-D and Type I-DT Traffic Signal Standards, Type PS and Type PPB Traffic Signal Standards, Double Diagonal Ramp Placement for Traffic Signal Standard, Double Directional Ramp Placement for Traffic Signal Standards, Double Parallel Ramp Placement for Traffic Signal Standards, Overhead Street Name Sign Mounting and Fabrication Details, DISCONTINUED: "H" Mount ADA Pedestrian Push Button Assembly, DISCONTINUED: Audible Pedestrian Signal Detail, DISCONTINUED: Push Button Marking Options for Pedestrian Warning Lights, Pre-emption Indicator Light Details and Pre-emption Detector Mounting Details, Mounting Bracket Assembly with Tenon Clamp, Type II and III Traffic Signal Pole Foundation Detail, Type I, Type I D, Type I DT, Type PS, Type PPB Traffic Signal Pole Foundation Detail, Loop Numbering, Loop Detector Configuration and Saw Cut Details, Input Terminal for "P" Cabinet Detection Panel Assembly, Input Terminal for "MSX" Cabinet Detection Panel Assembly, Video Camera Mounting on Mast Arm Details, Video Camera Mounting on Safety Light Details, Fisheye Video Camera Mounting on Mast Arm Details, DISCONTINUED: Typical Single Door Cabinet Pad Installation Details, Typical Front and Back Door Cabinet Pad Installation Details, DISCONTINUED: Typical Single Door "P" Cabinet Details, Typical Front and Back Door "P" Cabinet Details, Traffic Signal Service with Battery Backup Electrical Cabinet Detail, Traffic Signal Service with Battery Backup Wiring Diagram, Type "P" Cabinet Interior Layout (Left Side), Type "P" Cabinet Interior Layout (Right Side), Type "P" Detection Assignments for Card Cage, Type "MSX" Cabinet Interior Layout (Back), Type "MSX" Cabinet Interior Layout (Door), Type "MSX" Cabinet Interior Layout (Left Side), Type "MSX" Cabinet Interior Layout (Right Side), Type "MSX" Detection Assignments for Card Cage, "COV 44 D" for 2070N, NEMA X3, and XN-2 "D" Connector and PIN Assignments, 9800ATC T2 "D" Connector and PIN Assignments, Type "M" HAWK Signal Cabinet Interior Layout (Back), Type "M" HAWK Signal Cabinet Interior Layout (Door), Type "M" HAWK Signal Cabinet Interior Layout (Left Side), Type "M" HAWK Signal Cabinet Interior Layout (Right Side), Type "M" HAWK Signal Detection Assignments for Card Cage, Polara APS Navigator Interconnect Board and Wiring Harness, City Street Lighting Requirements Schedule Luminance Method (Straight Sections), City Street Lighting Requirements Schedule Illuminance Method (Curved Sections), City Street Lighting Requirements Intersection Illuminance, Type A and Type AT Arterial Lighting Standards, DISCONTINUED: Type A and Type AT Residential Lighting Standards, DISCONTINUED: Painting Details for Type D and Type DT Light Standards, Direct Burial for Street Lighting Standards, Cast-in-Place Foundation for Street Lighting.